Die FBB betreibt den Flughafen Schönefeld und über ihre Tochtergesellschaft BFG den Flughafen Tegel. Im Jahr 2017 wurden an den Flughäfen rund 33,3 Millionen Passagiere befördert. Damit ist Berlin der drittgrößte Flughafenstandort in Deutschland. Um die nötigen Kapazitäten für die Zukunft zu schaffen, entsteht derzeit der neue Flughafen Berlin Brandenburg Willy Brandt am Standort Schönefeld.
Aufrufe
vor 4 Jahren

Annual Report 2013

  • Text
  • Berlin
  • Brandenburg
  • Aircraft
  • Tegel
  • Flughafen
  • Assets
  • Passengers
  • Previous
  • Operational
  • Movements
  • Annual

→ 26 | Flughafen

→ 26 | Flughafen Berlin Brandenburg GmbH The most important principle for SPRINT: the tasks are broken down into manageable packages so that the complexity can be mastered. SPRINT 2013 Action Plan Producing Results The data cables are being rearranged. Picture page 24 / 25: Bird’s-eye view of the terminal and Airport City April 2013 saw the launch of the action plan SPRINT. All of the tasks related to the operational startup of BER, from the construction work which remains to be done to approvals, trial operation and to the opening of the airport itself are bundled in this programme. The objective is to structure the construction site in accordance with the simple principle “Think, Plan, Build”. SPRINT has made it possible to put an end to the standstill at the construction site, to stop the loss of know-how and to systematise the planning. Solutions have been reached for all of the fire protection issues and technical problems and are now being implemented step by step. Rebuilding of smoke removal systems After months of work, the Working Group Smoke Removal in the action plan SPRINT submitted a concept in November 2013 showing how the smoke removal control system decisive for the fire protection should be rebuilt so that it would function properly and meet the requirements for approval. In October 2013, the Airport Company and Siemens concluded a contract for the rebuilding of the smoke removal control system. In December 2013, the central design and approval planning for the smoke removal system was awarded to the planning office Arcadis. Large sections of the project have been processed and contracts have been awarded to companies for execution. Overhaul of cable boxes The acceleration of the work before the planned opening in 2012 caused incorrect placement and overcrowding of cable in the boxes. All of this work must now be overhauled. The correct control of the smoke removal system alone requires 92 kilometres of cable to be relaid. Rebuilding of sprinkler system The sprinkler system has been divided into three parts (sprinkler systems Terminal / Main Pier, North Pier and South Pier), reducing complexity and

Meeting in the Project Management Office in the North Pier The sprinkler system in the North Pier has been completed and is being covered. making the systems more dependable and easier to control. At the same time, the doubled redundancy of the system required by the approval authorities is being installed. The sprinkler system in the North Pier has been completed; the installation of the covering for the system began in February 2014. Planning for the new installation of the sprinkler system in the South Pier is in progress. The system installed in the Main Pier retains its full functional capability. Rebuilding BER-LAN The BER-LAN is the key link in the infrastructure of the new airport; almost all of the application systems and technical equipment are based on the BER-LAN services. The BER-LAN is being rebuilt on the basis of a so-called carrier technology which enables strict separation of individual users and prevents disruptions in one customer network from affecting other airport customers or systems.

Unsere Publikationen

Annual Report 2017
Geschäftsbericht 2017
Annual report 2016
Geschäftsbericht 2016
Annual Report 2015
Geschäftsbericht 2015
Geschäftsbericht 2014
Geschäftsbericht 2013
Annual Report 2012
Geschäftsbericht 2012
Geschäftsbericht 2011
Geschäftsbericht 2010
Annual Report 2009
Wegweiser Flughafen Tegel
Wegweiser Flughafen Schönefeld
Flugplan Sommer 2015 SXF/TXL Timetable Summer 2015
Flugplan Winter 2014/2015 SXF/TXL - Update
Flugplan Winter 2014/2015 SXF/TXL
Flugplan Sommer 2014 SXF/TXL
Flugplan Sommer 2014 SXF/TXL
Fluglaermbericht 2017
BER aktuell 06/2018
BER aktuell 04/2018
BER aktuell 02/2018
BER aktuell 01/2018
BER aktuell 12/2017
BER aktuell 11/2017
BER aktuell 10/2017
BER aktuell 09/2017
BER aktuell 08/2017
Fluglärmbericht 2016
BER aktuell 07/2017
BER-aktuell 01/2017
BER aktuell 12/2016
BER aktuell 11/2016
BER aktuell 10/2016
BER aktuell 09/2016
BER aktuell 08/2016
BER aktuell 07/2016
Schallschutzfibel
BER aktuell 06/2016
Fluglärmbericht 2015
BER aktuell 03/2016
BER aktuell 01/2016
BER aktuell 12/2015
BER aktuell 11/2015
BER aktuell 10/2015
BER aktuell 09/2015
BER aktuell 08/2015
BER aktuell 07/2015
Fluglärmbericht 2014
BER aktuell 06/2015
BER aktuell 05/2015
BER aktuell 04/2015
BER aktuell 03/2015
BER aktuell 02/2015
BER aktuell 01/2015
BER aktuell 12/2014
BER aktuell 11/2014
BER aktuell 10/2014
BER aktuell 09/2014
BER AKTUELL 08/2014
BER aktuell 07/2014
BER aktuell 06/2014
BER aktuell 01/2014
BER aktuell 05/2014
BER aktuell 04/2014
BER aktuell 03/2014
BER aktuell 02/2014
BER aktuell 12/2013
BER aktuell 11/2013
BER aktuell 10/2013
BER aktuell 09/2013
Umweltbericht 2016
Fluglärmbericht 2016
Umweltbericht 2014
Fluglärmbericht 2014
Fluglärmbericht 2013
Umweltbericht 2012
Fluglärmbericht 2012
Umweltbericht 2011
Gate 66 Frühjahr 2012
Gate 70 Sommer 2013
Gate 67 Herbst 2012
Gate 68 Winter 2012
Gate 69 Frühjahr 2013
Berlin Brandenburg Aircraft Tegel Flughafen Assets Passengers Previous Operational Movements Annual

News