Die FBB betreibt den Flughafen Schönefeld und über ihre Tochtergesellschaft BFG den Flughafen Tegel. Im Jahr 2017 wurden an den Flughäfen rund 33,3 Millionen Passagiere befördert. Damit ist Berlin der drittgrößte Flughafenstandort in Deutschland. Um die nötigen Kapazitäten für die Zukunft zu schaffen, entsteht derzeit der neue Flughafen Berlin Brandenburg Willy Brandt am Standort Schönefeld.
Aufrufe
vor 5 Jahren

Annual Report 2011

  • Text
  • Airport
  • Berlin
  • Brandenburg
  • Annual
  • Schoenefeld
  • Tegel
  • Management
  • Development
  • Aviation
  • Construction
  • Berlinairport
Annual Report 2011

→ 14 | Berlin

→ 14 | Berlin Brandenburg Airport → Annual Report 2011 The decision of the Federal Administrative Court gives security for the planning: BER can be operated in the way that has been planned for years. BER The most important steps 2011 The most important project of the future in the capital city region, Berlin Brandenburg Airport Willy Brandt, will begin operating on 03 June 2012. A review of the year 2011. Fundamental decision for BER The last fundamental decision concerning the construction of Berlin Brandenburg Airport Willy Brandt was handed down in October: the German Federal Administrative Court confirmed in the final instance the supplementary planning stipulation decision concerning night-time flights. The Brandenburg Infrastructure Ministry had regulated the number of flights in the periphery times between 10 p.m. and midnight and between 5 and 6 a.m. in this decision from October 2009. Airport company, airlines and airport neighbours now have security for their planning. The new airport can now be opened the way it has been planned and constructed for years: as an airport which will connect Berlin and Brandenburg with the world far better than the two airports in Schoenefeld and Tegel were able to do by offering more long-haul routes and additional flights to European destinations. The two largest airlines at the current airports, airberlin and Lufthansa, reacted immediately to the decision by the Federal Administrative Court with a positive signal in the direction of BER: both airlines announced that they would be raising the level of their commitment at Berlin Brandenburg Airport. Commencement of base trial operation Base trial operation at Berlin Brandenburg Airport successfully began on 24 November. Employees of the airlines, security and ground handling services and the airport are testing all of the operational procedures: the

One terminal for all departures: the central check-in area of the new airport full scope of aviation operations from check-in to security checkpoints to boarding will be simulated. Moreover, the workers have the opportunity to become thoroughly acquainted with the topography of their future workplaces during training sessions for theory and on-site inspections. The objective is to take advantage of the six-month trial operation to discover as far as possible all of the problems and sources of error and to eliminate them. The goal is to secure operational start-up which runs with the least friction possible. BBI becomes BER The new look of Berlin Brandenburg Airport was unveiled in June. Along with the implementation of the new design, the project name BBI is being Annual Report 2011 � Berlin Brandenburg Airport | 15 � replaced as planned by the new name Berlin Brandenburg Airport Willy Brandt. This includes the new abbreviation and logo BER, which is the IATA code for the new airport and will serve as the brand name as well. Construction work at Berlin Brandenburg Airport Terminal Work on the interior of the terminal has been running at full steam since the beginning of 2011: the check-in areas in the terminal departure area have been largely completely, escalators and lifts have been installed and the installation of the guidance system has begun. Passenger bridges have

Unsere Publikationen

Annual Report 2017
Geschäftsbericht 2017
Annual report 2016
Geschäftsbericht 2016
Annual Report 2015
Geschäftsbericht 2015
Geschäftsbericht 2014
Geschäftsbericht 2013
Annual Report 2012
Geschäftsbericht 2012
Geschäftsbericht 2011
Geschäftsbericht 2010
Annual Report 2009
Wegweiser Flughafen Tegel
Wegweiser Flughafen Schönefeld
Flugplan Sommer 2015 SXF/TXL Timetable Summer 2015
Flugplan Winter 2014/2015 SXF/TXL - Update
Flugplan Winter 2014/2015 SXF/TXL
Flugplan Sommer 2014 SXF/TXL
Flugplan Sommer 2014 SXF/TXL
Fluglaermbericht 2017
BER aktuell 06/2018
BER aktuell 04/2018
BER aktuell 02/2018
BER aktuell 01/2018
BER aktuell 12/2017
BER aktuell 11/2017
BER aktuell 10/2017
BER aktuell 09/2017
BER aktuell 08/2017
Fluglärmbericht 2016
BER aktuell 07/2017
BER-aktuell 01/2017
BER aktuell 12/2016
BER aktuell 11/2016
BER aktuell 10/2016
BER aktuell 09/2016
BER aktuell 08/2016
BER aktuell 07/2016
Schallschutzfibel
BER aktuell 06/2016
Fluglärmbericht 2015
BER aktuell 03/2016
BER aktuell 01/2016
BER aktuell 12/2015
BER aktuell 11/2015
BER aktuell 10/2015
BER aktuell 09/2015
BER aktuell 08/2015
BER aktuell 07/2015
Fluglärmbericht 2014
BER aktuell 06/2015
BER aktuell 05/2015
BER aktuell 04/2015
BER aktuell 03/2015
BER aktuell 02/2015
BER aktuell 01/2015
BER aktuell 12/2014
BER aktuell 11/2014
BER aktuell 10/2014
BER aktuell 09/2014
BER AKTUELL 08/2014
BER aktuell 07/2014
BER aktuell 06/2014
BER aktuell 01/2014
BER aktuell 05/2014
BER aktuell 04/2014
BER aktuell 03/2014
BER aktuell 02/2014
BER aktuell 12/2013
BER aktuell 11/2013
BER aktuell 10/2013
BER aktuell 09/2013
Umweltbericht 2016
Fluglärmbericht 2016
Umweltbericht 2014
Fluglärmbericht 2014
Fluglärmbericht 2013
Umweltbericht 2012
Fluglärmbericht 2012
Umweltbericht 2011
Gate 66 Frühjahr 2012
Gate 70 Sommer 2013
Gate 67 Herbst 2012
Gate 68 Winter 2012
Gate 69 Frühjahr 2013
Airport Berlin Brandenburg Annual Schoenefeld Tegel Management Development Aviation Construction Berlinairport

News